© 2016 by Old Dry Road Farm. Proudly created with Wix.com

Property Improvements

On August 11, 12, and 13, the U.S. Army Reserve Engineering 333rd Unit completed a heavy equipment training program that resulted in much-needed improvements to Highland Road. A crew of about 10 reservists participated. In addition to the road grading and filling, the crew also assisted using their equipment on several additional projects on Old Dry Road Farm property. Thanks so much for your help!

 

Also, thanks to PADOT for delivering several loads of asphalt millings that were used by the reservists to improve the road surface.

 

 

Please reload

Featured Posts

Aug. 3 PABA at Old Dry Road Farm

March 31, 2019

1/2
Please reload

Recent Posts

April 24, 2018

Please reload

Archive
Please reload

Search By Tags
Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square